project cost

project cost

 英

  • 网络工程造价;项目成本;工程项目费用

例句

Earned value is an effective method for project cost and progress integration, but it does not take account of quality factors.

一种有效项目成本进度集成方法考虑质量因素

Compact, easy to move, easy to install and can reduce the project cost, without the construction of pumping stations.

结构紧凑移动方便安装简单减少工程造价无需建造泵房

First, the cost of modern management theory and practical experience applied to cost management, improving project cost management level.

现代成本管理理论经验运用企业成本管理实际提高施工项目成本管理层次

This paper describes how the decision-making stage, the design phase of the project cost control within the approved limits.

本文主要介绍如何决策阶段设计阶段工程造价控制批准限额之内

Be on guard risk of project cost audit is the foundation that does work of audit of good project cost, its sense is quite great.

防范工程造价审计风险做好工程造价审计工作基础意义相当重大

The project cost is the construction of a project put into operation by the expenditure of the sum of the cost.

工程造价一个建设项目建成投产支出各项费用总和

The fourth part of the design of the project cost of college education cost accounting and accounting subjects.

第四部分设计高校教育成本核算成本项目会计科目

Therefore, the influenced exerted by risks on cost management must be taken into account during the project cost management, i. e.

因此工程项目造价管理必须考虑风险造价影响工程造价进行风险管理

The team of project cost management was set up to bring the project cost into the "static control and dynamic management" system.

成立工程造价管理课题小组工程造价实行静态控制动态管理”;

Warm mix asphalt also has reduced the project cost, with the advantages of extending the service life of asphalt pavement.

沥青混合具有降低工程成本延长沥青路面使用寿命优势

Because of this reform, the formation mechanism of project cost has been a fundamental change.

由于革新工程造价形成机制发生根本转变

Project showed that a large number of domestic and international engineering design phase of the project cost impact of up to 35% to 75%.

国内外大量工程实例表明工程设计阶段工程造价影响达到35%~75%。

Project cost and schedule cannot be finalized without completing risk management.

没有完成风险管理项目成本进度不能最后达成

It proves that construction schedule, quality and safety goals can be reached with DOKA formwork system, and project cost can be reduced.

实践证明DOKA模板系统保证施工进度质量安全节约成本

Indeed, the hidden cost for the total project cost of 7 to 10% should be reasonable.

业内人士介绍隐蔽工程报价报价7%10%应该合理

If the basic construction cost is controlled very good, the goal of the total project cost will be achieved.

只要控制最小施工单元成本项目成本目标可以实现

Therefore, the implementation phase of construction projects on the dynamic management of project cost is a very important issue.

因此建设项目实施阶段工程造价动态管理研究一个十分重要课题

The application of the Earned Value Method in project cost control management make cost can be evaluated.

利用项目进行项目费用控制保证项目费用预算之内

Fifth, the construction project cost management provides the weight construction project management achievements the objective rod.

施工项目成本管理提供衡量施工项目管理绩效客观标尺

This paper studies the application of the thoughts of postponement into resources distribution for project cost optimization.

成本优化目标研究如何利用延迟思想解决如何分配项目资源

The system is easily operation, a simpler process, lower the project cost and good applicable prospect.

工艺系统简单运行可靠投资较好应用前景

You can identify tasks or resources with budget risks and adjust the task or resource costs to bring the total project cost within budget.

可以确定具有预算风险任务资源调整任务资源成本以便项目成本控制预算内

Accordingly, must press the objective law of goods economy, control project cost reasonably.

因此必须商品经济客观规律合理控制工程造价

The solution was rolled out to all 37 financial institutions within Synovus at no additional project cost.

没有增加项目成本情况解决方案Synovus旗下所有37金融机构得到实施

construction project; cost control; Pareto law of income distribution.

建设项目费用控制收入分配定律

In short, the pre-construction project cost control for the entire project cost control has played a very important role.

总之建设项目前期造价制约整个项目造价制约有着非常重要作用

Finally, Palm Springs International Apartment in Beijing real estate construction project cost management real cases were analyzed.

最后通过北京棕榈国际公寓房地产建设项目成本管理实际案例进行系统分析

Every taches of the communications project cost management system have mutual contacts and interactions.

通信工程成本管理系统环节相互联系相互作用

As commented by the Standish Group, requirements issues account for 41% of the reasons for project cost overruns and cancellations.

正如StandishGroup意见一样需求问题通常项目开销超支或者项目取消41%责任

The standard of project cost management has turned into the main factor with company's survival and development.

工程项目成本管理水平高低成为制约企业生存发展主要因素

Initially, this paper analyse the lacks of the traditional communications project cost control methods.

论文首先研究传统通信工程项目成本控制方法分析它们不足

In order to reasonably reflect the project cost, budget and project budget is usually fixed in engineering to build a way to separate them.

为了合理反映工程造价预算定额工程预算通常工程构筑方式进行分类

Therefore, it is of great importance to guarantee and accelerate economic development to do the project cost control.

因此做好工程造价控制工作保证加速经济发展具有一定意义

To develop the existing customer, introduction of new project, cost reduction program and product change.

现有客户进行开发介绍项目降低成本产品交换

Reducing well spacing can economize project cost, but it will cause group pile effect and bring on the phenomenon of repelling hammering.

减小节约工程费用引起效应导致现象发生

The owner and the contractor agree to a project cost guaranteed by the contractor as maximum.

业主承包商同意承包商保证一个工程成本作为最大

Finally, compare the fourth concrete support of the Century Avenue and Lake Station from the duration and the project cost two aspects.

最后工期以及工程造价方面世纪大道湖滨第四进行对比

construction project; cost control; Longquan hotel construction project.

建设项目造价管理龙泉酒店建设项目

Through the economic analysis of ameliorated saline soil, the paper appraises the influence of project cost.

通过改良盐渍经济分析评价工程造价影响

Experienced on Project Cost Estimation, Tender Package preparation and Design coordination.

项目费用估算标书准备设计协调方面富有经验